Sewer Main

Our experience with sanitary and storm sewers is extensive. We have installed sanitary sewer as deep as 65’ below grade. Shaft installation, soil stabilization and trench shielding of any trench is within our capabilities. HCI has a Professional Engineer on staff who is experienced with excavation and trench shielding design. Open cut installations, tunneling, boring, by-pass pumping, vacuum excavation are all a part of our excavation arsenal.

Projects

MSD Projects in Greater Cincinnati
Project NameOwner
Arrow St. Pump Station Elimination, 6106′ – 12″ DIP Sanitary Sewer MSD of Greater Cincinnati
Emergency Stand-By Contract MSD- Deep Shaft Repairs, T & M Sewer Repair MSD of Greater Cincinnati
Cincinnati Main Line Repairs, T & M Sewer Repair MSD of Cincinnati, MSD
Ross Run Storm Sewer, 3200′ – 27″-60″ Storm Pipe MSD of Greater Cincinnati
Foley Forest Pump Station and Force Main, 1300′ – 8″ PVC F.M MSD of Greater Cincinnati
Winton Rd. Sewer, Sherwood PS Elimination, 4100′-8″-18″ San. Sewer MSD of Greater Cincinnati
CSO 37 & CSO 39-Combined Sewer Overflow Structures on existing 48″ Sewer MSD of Greater Cincinnati
Towers East Pump Station, Forced Main and Sanitary Sewer MSD of Greater Cincinnati
CSO 470 & CSO 471, 850′ of 24″ Sanitary; 500′ of 8″ Sanitary; Lift Station MSD of Greater Cincinnati
Montana Ave Sewer, 3100′ – 24″ Sanitary Sewer MSD of Greater Cincinnati
Westwood Northern Sewer, 4500′-18″ & 27″ Sanitary Sewer MSD of Greater Cincinnati
Winton Road CSO 217/483 Phase BMSD of Greater Cincinnati
Colerain Avenue, CSO 125MSD of Greater Cincinnati
SSO 700 STF Disinfection ImprovementsMSD of Greater Cincinnati
Liquid Ferric Sulfate Chemical Feed System and Building Improvements MSD of Greater Cincinnati
CSO 83 & 472- Red Bank Road Underflow ControlMSD of Greater Cincinnati
Northern Kentucky Sewer Projects
Project NameOwner
Allen Fork Sewer, 2,000′-24″ Sewer; 2,000′-Force Main Sanitation District No.1
South Union Sewer, 4,200′-36″ Sanitary Sewer Sanitation District No.1
Riley Rd Sewer, 10,000′-8″ to 21″ Sewer; 7,200′-20″ Force Main Sanitation District No.1
Van Deren Area Improvements, 2500′-Storm; 3000′-Sanitary; 2500′-Sewer Taps City of Lakeside Park, KY
Virginia St. Sewer, 5000′ – 6″ & 8″ Sanitary Sewer Sanitation District No.1
River Water Intrusion ProjectSanitation District No. 1
Georgetown/Scott County South Sewer ExtensionCity of Georgetown
River Water Intrusion GPS 2 & 3 ImprovementsSanitation District No. 1
Newport Levy gate installationNewport, KY
Other Large Sewer Projects Indiana, Ohio and Kentucky
Project NameOwner
10th & Mitthoefer Sewer, 17,000′-8″ PVC Sewer and 280 Taps City of Indianapolis
Hillsboro Ohio Sewer Improvements, 6200′ – 8″ & 12″ Sewer Replacement City of Hillsboro
Cedar Crest WWTP, Pre-Packaged WWTP, Access Road & Site Util City of Dry Ridge, KY
WWTP Improvements, EQ Basin and UV System Town of Speedway, IN
Storm Sewer Separation, 12″ – 66″ Storm Sewer and Structures Town of Speedway, IN
Wolf Run Pump Station Relocation, 3550′ – 48″ Sewer 9570′ – 30″ Force Main Lexington Fayette Urban County
Great Miami River Crossing, 267′ – 24″ DIP Sewer Siphon across River City of Piqua, OH
SSO 700 Disinfection Improvements MSD, Hamilton County, Ohio
Georgetown/Scott County South Sewer ExtensionCity of Georgetown, Kentucky
Greene County Clifton Area WRRFGreene County Sanitary Engineering